October 2, 2003
- Ready to move in! |

October 2, 2003
- Beautiful Home! |
Features:
- 1,503 sq.
feet finished upstairs
- 1,492 sq.
feet unfinished walkout basement
- 3 Bedrooms
(main floor)
- 3+ Acres
- 90% Forced
Air Furnace
- Central Air
- Oak Trim
- Country Oak
Cabinets
- California
corners
- Gas Fireplace
W/ Oak Mantel
- Vaulted Ceilings
Per Plan
- 9 Foot Main
Floor Walls
- Large Master
Suite
- His and Her
Sinks
- Large Jetted
Tub
- 5 Foot Shower
W/ Seats
- Walk in Master
Closet
- Sherwin Williams
Paint
- Knockdown
Texture
- 2 by 6 Exterior
Walls
- Blown-In
Fiberglass Insulation R-20 Walls R-38 Ceilings
- Large Walkout
Basement
- Basement
Bathroom Rough-In
- Water Softener
Hook Up
- 2- Frost
Free Water Spickets
- Six Gas Outlets
1. Garage Future Heater
2. Deck For Bar-B-Que
3. Dryer Gas and Electric
4. Oven Gas and Electric
5. Furnace
6.Water
Heater
- Cat 5 Telephone
Jacks
- Moen Faucets
- Garage Is
Insulated, Sheetrocked and Painted
- Insulated
Martin Garage Doors
- 10 by 20
Cedar Deck
- Maintenance
Free Colorside Siding
- Metal Fascia
and Soffit
- Seamless
Gutters
- Architectural
Shingles
Just off Erickson
Ranch Road with a view of the hills.
Directions: Take Deadwood Ave. north past the Windmill Exit
for approximately 5 miles. The road forks and turns into Erickson
Ranch Rd. continue north for about 3.5 miles. This property will
be on the east side of the road.

©2003 Kaski Homes Inc..
All rights reserved.
|

August 14, 2003 |

August 22, 2003 |

August 22, 2003 |

August 22, 2003 |

August 22, 2003 |

August 22, 2003 |

August 14, 2003
- - Quality custom design. |

July 30, 2003 -
Countertops almost look like marble, great colors. |

July 30, 2003 |

July 30, 2003 -
Fixtures, a must see! |

July 22, 2003 |
This home
is built with quality and
designed with the home owner's
needs top of the mind.
Call today,
605-342-9606,
and see if this is the home you
have been waiting to
build in your future.
|

July 22, 2003 |

July 22, 2003 |

July 16, 2003
|

July 16, 2003 - Vaulted & dropped ceiling |

July 8, 2003 |

July 8, 2003 |

July 8, 2003 |

July 8, 2003 |

June 27, 2003 |

June 27, 2003 -
Main floor laundry |

June 20, 2003 - Driveway pad in. |

June 20, 2003 - Sheetrock going up. |

June 12, 2003 |

June 12, 2003
|

June 6, 2003 |

June 6, 2003 |

May 30, 2003 |

May 30, 2003 - Sheetrock coming soon. |

May 30, 2003 - Insulated garage |

May 30, 2003 |

May 23, 2003 |

May 23, 2003 |

May 23, 2003 |

May 23, 2003 |

May 16, 2003 |

May 16, 2003 |

May 9, 2003 |

May 9, 2003 |

Work goes on Rain or Shine-May 1, 2003 |

May 1, 2003 |

April 22, 2003
|

April 22, 2003 |

April 11, 2003
|

April 11, 2003 |

April 4, 2003
|

April 4, 2003 |

March 28, 2003
|

March 28, 2003 |

March 20, 2003 |

March 20,2003 |
 |
 |
 |
 |
 |
 |
 |